Home Sitemap Login

News

Sign up to our Newsletter
 
Company
Name
Email
 

The installation of the new bespoke pyramid rooflights, has been completed on site.   These visually striking and iconic units, were installed as part of a technically challenging façade, that also included mono-pitch rooflights, fabricated using Aluprof’s MB-SR50N EFEKT curtain walling system.   Now that installation has been completed, they will only serve to add to the already impressive London skyline.


Read More ⇒

The installation of the new Aluprof windows and curtain walling has commenced on site. Work has started on the newly reconfigured Endsleigh Street elevation and will then proceed to the courtyard extension and link bridge. Systems being used include;   • Aluprof MB-70US HI Window System • Aluprof MB-78EI Fire Rated Door System • Aluprof MB-86 ST Door System • Aluprof MB-SR50N EFEKT Curtain Walling System • Aluprof MB-SR50N EI30 Fire Rated Curtain Walling System There are also a number of horizontal and vertical GRC fins being installed to the new façade.


Read More ⇒

The installation of the new Metal Technology curtain walling and Kingspan rainscreen cladding, has been completed.   The project involved multiple façade types and complicated interface details, however the complete envelope package was delivered to a very high standard. Systems that were used include;   • Metal Technology’s System 17 High Rise Curtain Walling System • Metal Technology’s System 5-20D Hi + Door System • Kingspan Benchmark Rainscreen Cladding System • Renson Linius Continuous Louvre System • Levolux 900 Sunbreaker System • Boon Edam Manual 4-Wing Tourniket Revolving Door  


Read More ⇒

Windell Limited have been appointed to supply and install the glazed façade package on the new Student Accommodation development at College Avenue Belfast.   In conjunction with McAleer & Rushe, Windell will install the external windows, doors and curtain walling systems on this purpose built student accommodation scheme on a 0.6 acre site providing 804 bedrooms, plus commercial space and car parking.   The package will also include a bespoke louvre system, which will be fixed to the front of all opening casements.   On site installation is due to start in May 2017, with a 29 week delivery period.     Systems being used include;   Metal...


Read More ⇒